16193A; Short Compensation - Agilent Technologies 4286A User Manual

Rf lcr meter
Table of Contents

Advertisement

16193A

SHORT Compensation

The names of each part are listed above.
2. 1
Loosen the locking knob. 2
positioner until the nose of the pressure arm is
located outside the stage.
C-6
Fixture Compensation Procedures for the 16191A and 16193A
1. 1
button. 3
arm latch button so that the pressure arm is held.
Rotate the
3. Position the size selection frame depending on the
size of the DUT. (This procedure shows the case for D
as an example.)
Push the arm lifter. 2
Release the arm lifter while pushing the
Push the arm latch

Advertisement

Table of Contents
loading

Table of Contents