Webasto ProCore Edge Installation, Operation, Service And Maintenance Instructions page 42

Table of Contents

Advertisement

Installation, Operations, Service & Maintenance
ProCore Edge
Connect the battery communication wires – the CAN bus for battery BMS, battery
monitor, and pilot (interlock) – to the screw terminal per Table 1 and tighten the
terminal screws with 5.31 in-lbs (0.6 Nm) of torque.
Fig. 29 – Battery Communication Wires Connected to the Screw Terminal
Part Number 5911110 A02
Page 42 of 112
Webasto Charging Systems, Inc.

Advertisement

Table of Contents
loading

Table of Contents