Installing Solvent Shut Off Valves - Thermo Scientific Vanquish VH-P10 Operating Manual

Table of Contents

Advertisement

6
Operation
6.9.3

Installing Solvent Shut Off Valves

When
Parts required
Tools and additional items required
Preparations
Follow these steps
Page 106
To shut off the solvent flow through the system at the solvent reservoir,
for example, to prevent solvent from flowing through the system when
you open a flow connection on the low-pressure side
To install a shut off valve during initial setup of the flow connections,
see the related steps in
page
64.
To install a shut off valve after initial operation of the pump, follow
the steps further down in this section.
Solvent shut off valve, kit containing one shut off valve and fitting
connections
Tubing cutter
Solvent suitable for purging the pump
Turn off the pump flow and wait until the system pressure is down to
zero.
Follow the steps for each solvent line in which you want to install a shut
off valve.
1. Unscrew the cap of the solvent reservoir and remove the solvent
line together with the cap from the reservoir.
2. Stop purging as soon as the solvent line is empty.
3. Retighten the reservoir cap hand-tight. Verify that the retaining
guide remains in the hole in the reservoir cap. If it does not, press
the retaining guide into the hole to ensure that the tubing is kept in
place in the cap.
section 5.6.5 Connecting the Solvent Lines,
Vanquish Pumps (VH-P10) Operating Manual

Advertisement

Table of Contents
loading

Table of Contents