Setting Up The Hardware; System Arrangement - Thermo Scientific Vanquish VH-P10 Operating Manual

Table of Contents

Advertisement

5
Installation
5.5

Setting Up the Hardware

5.5.1

System Arrangement

Page 54
This section describes how to set up the hardware and provides
information about the pump connectors and cables.
The pump is part of the Vanquish system. The system modules are
typically arranged in a system stack, with the arrangement depending on
the system configuration.
Figure 8: Vanquish system, standard configuration (example)
No.
Description
1
Solvent Rack
2
Detector
Vanquish Pumps (VH-P10) Operating Manual

Advertisement

Table of Contents
loading

Table of Contents