HPE ProLiant DL360 Gen11 User Manual page 94

Hide thumbs Also See for ProLiant DL360 Gen11:
Table of Contents

Advertisement

WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
WARNING:
components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
CAUTION:
installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
6. Remove the access panel .
7. Remove the primary PCI riser cage.
8. Install the expansion board.
9. Connect any required internal or external cables to the expansion board.
10. Install the primary PCI riser cage .
11. Install the access panel .
12. Install the server in the rack.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server .
Installing an expansion board in slot 2
Installing an expansion board in slot 2
Prerequisites
Prerequisites
Before installing this option, be sure you have the following:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
Procedure
1. Observe the following alerts:
HPE ProLiant DL360 Gen11 Server User Guide
94

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents