3. Open the chassis ears (callout 1), and then tighten the shipping screws (callout 2).
4. Connect all peripheral cables to the server.
5. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
6. If installed, close the cable management arm.
Installing the rack rail hook-and-loop strap
Installing the rack rail hook-and-loop strap
About this task
About this task
HPE ProLiant DL360 Gen11 Server User Guide
88