8. Connect the cable to the system board.
9. If needed, install the optical drive.
10. Install the access panel .
11. Install the server in the rack.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
14. Power up the server.
Results
Results
The installation is complete.
Installing an 8SFF optical drive
Installing an 8SFF optical drive
Prerequisites
Prerequisites
Install the 8SFF display port/USB/optical blank option.
Be sure you have the following:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .