7. Remove the access panel.
8. Connect the power cable to the 8SFF drive backplane.
9. Connect the data cable .
10. Install drives or drive blanks.
11. Install the access panel.
12. Install the server in the rack.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server.
Energy pack options
Energy pack options
HPE ProLiant DL360 Gen11 Server User Guide
44