T-10 Torx screwdriver
2 SFF drives or drive blanks
Procedure
Procedure
1. Back up all server data.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Do one of the following:
a. Extend the server from the rack.
b. Remove the server from the rack.
5. Remove the universal media bay blank.
6. Install the 2 SFF drive cage.
HPE ProLiant DL360 Gen11 Server User Guide
43