HPE ProLiant DL360 Gen11 User Manual page 82

Hide thumbs Also See for ProLiant DL360 Gen11:
Table of Contents

Advertisement

10. Install the access panel.
11. If the server was removed from an enclosure or a rack, reinstall it now.
12. Connect all peripheral cables to the server.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
15. Power up the server.
Results
Results
The installation is complete.
Rack mounting options
Rack mounting options
Use the quick-deploy, toolless HPE rack rail option to install the server in a standard four-post server. The rail design supports
installation on server of different mounting interfaces.
For cable management, the rack rail kit might include one or both of the following options:
Rack rail hoop-and-loop strap
Cable management arm
Subtopics
Subtopics
Rack mounting interfaces
Rack mounting interfaces
Rail identification markers
Rail identification markers
Installing the rack rails
Installing the rack rails
Installing the server into the rack
Installing the server into the rack
Installing the rack rail hook-and-loop strap
Installing the rack rail hook-and-loop strap
Installing the cable management arm
Installing the cable management arm
Rack mounting interfaces
Rack mounting interfaces
The server rails can be installed in a rack that has the following mounting interfaces:
Round-hole
The illustrations used in this procedure show an icon on the upper right corner of the image. This icon indicates the type of mounting
interface for which the action illustrated in the image is valid.
Rail identification markers
Rail identification markers
Square-hole
Threaded round-hole
HPE ProLiant DL360 Gen11 Server User Guide
82

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents