HPE ProLiant DL360 Gen11 User Manual page 102

Hide thumbs Also See for ProLiant DL360 Gen11:
Table of Contents

Advertisement

Installing an expansion board in the secondary riser cage
Installing an expansion board in the secondary riser cage
Prerequisites
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
T-10 Torx screwdriver
Procedure
Procedure
1. Observe the following alerts:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
WARNING:
components to cool before touching them.
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
CAUTION:
installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
6. Remove the access panel .
7. Remove the secondary riser:
Secondary full-height
Secondary low-profile
HPE ProLiant DL360 Gen11 Server User Guide
102

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents