Optional) Installing Battery Cabinets Outside The Smart Module; Optional) Installing Lead-Acid Batteries - Huawei FusionModule2000-S User Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000-S:
Table of Contents

Advertisement

FusionModule2000-S Smart Modular Data Center
User Manual
(Integrated UPS 3.0) and UPS5000-E-(30 kVA-180 kVA) User Manual (Integrated
UPS) .
3.9.3 (Optional) Installing Battery Cabinets Outside the Smart
Module
Battery cabinets are installed in the same way as other cabinets. The installation
position depends on the design in the bidding phase.

3.9.4 (Optional) Installing Lead-Acid Batteries

For details, see the documents delivered with the equipment, the documents
obtained by scanning the QR code, or
Quick Guide .
Precautions for Installing Lead-Acid Batteries
Preparations
Tools: Phillips screwdriver, pallet truck, wrench, protective gloves
Materials: insulation tape, lead-acid battery, copper bar or cable
Documents: lead-acid battery wiring diagram, documents delivered with lead-acid
batteries
Skill requirement: personnel qualified for installing lead-acid batteries
Procedure
Step 1 Use a pallet truck to move lead-acid batteries close to the installation position.
Issue 07 (2022-09-30)
To ensure personal safety, unpack, move, and install lead-acid batteries by
following the instructions in the manuals delivered with the batteries.
Except for necessary functional parts, wrap the exposed metal parts of tools
such as Phillips screwdrivers and wrenches with at least two layers of
insulation tape.
Wrap the OT terminal of a cable with insulation tape, and remove the tape
when the cable is placed in position and the terminal to be connected is
confirmed.
Leave one break point disconnected when connecting lead-acid batteries on
each layer, and connect the break point on each layer after other cables are
connected.
Tighten screws to prevent sparks generated upon power-on.
Ensure that lead-acid battery cables are connected by qualified technicians.
Ensure that all the safety measures have been taken before installation.
Ensure that the circuit breakers in the BCB box are OFF when installing lead-
acid batteries.
Never short-circuit the two poles of a battery when handling or installing
lead-acid batteries.
Copyright © Huawei Technologies Co., Ltd.
Battery Cabinet Battery Cable Connection
3 Hardware Installation