Step 7 The Branch Disconnected alarm generated for a reserved circuit breaker can be
masked on the ECC800-Pro WebUI. To mask an alarm, choose System Settings >
Alarm Parameters, select the corresponding device, and disable the
corresponding Branch Disconnected alarm parameter.
----End

5.1.5 Commissioning a Smart rPDU

Prerequisites
One end of the straight-through cable has been connected to the COM port on
the rPDU and the other end has been connected to the COM port on the ECC800-
Pro or ETH converter.
Context
Table 5-11 rPDU basic information
Model
PDU2000-32-1P
H-20/4-M1
PDU2000-32-1P
H-20/4-M1
MD-1324-2004
PDU2000-16-3P
H-24/6-M1
PDU2000-16-3P
H-24/6-M1
PN1-32I10-20E4
G-AV4
ZFIF-112-0800
PN1-16X18-8E-
AH4W
Issue 07 (2022-09-30)
NO TE
● When switching on an output circuit breaker, check whether the mapping between the
circuit breaker and the downstream device is consistent with that in the design drawing.
● Do not switch on the reserved circuit breakers.
● When switching on the circuit breakers, observe whether there is any abnormal
phenomenon, such as sparks or unsmooth switching.
Name
Displayed on
the WebUI
PDU2000-M(C)
PDU2000-M(H)
rPDU-MPDU
PDU2000-
MH-3PH
PDU2000-
MC-3PH
Copyright © Huawei Technologies Co., Ltd.
Output
Port
20 x C13
+ 4 x C19
20 x C13
+ 4 x C19
20 x C13
+ 4 x C19
24 x C13
+ 6 x C19
24 x C13
+ 6 x C19
20 x C13
+ 4 x C19
rPDU
8 x C13
8 x C13
5 Power-On Commissioning
Eleventh and
BOM
Twelfth
Number
Characters in
Device
Barcode
a
FT
2120701
6B
2120701
FT
2122280
6B
2120624
FT
2120624
6B
2122201
FT
2123125
6B
2122935
150

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c10

Table of Contents