Mounting The Measuring Device; Required Tools; Preparing The Measuring Device - Endress+Hauser Proline Prosonic Flow E 100 HART Operating Instructions Manual

Ultrasonic time-of-flight flowmeter
Table of Contents

Advertisement

Proline Prosonic Flow E 100 HART
Endress+Hauser
NOTICE
Electronics overheating on account of thermal insulation!
Observe maximum permitted insulation height of the transmitter neck so that the
transmitter head is completely free.
t
Maximum insulation thickness 2 cm (0.79 in)
a
Minimum distance from transmitter to insulation
6.2

Mounting the measuring device

6.2.1

Required tools

For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2

Preparing the measuring device

1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.3
Mounting the measuring device
WARNING
L
Danger due to improper process sealing!
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
Ensure that the gaskets are clean and undamaged.
Install the gaskets correctly.
1. Ensure that the direction of the arrow on the sensor matches the flow direction of
the medium.
2. Install the measuring device or turn the transmitter housing so that the cable entries
do not point upwards.
Installation
t
a
A0034104
A0029263
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Proline Prosonic Flow E 100 HART and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Proline prosonic flow e 100

Table of Contents