Mounting the measuring device

6.2.1

Preparing the measuring device

1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.2

Mounting the sensor

WARNING
L
Danger due to improper process sealing!
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
Ensure that the gaskets are clean and undamaged.
Secure the gaskets correctly.
Apply the correct screw tightening torques and comply with the mounting instructions
→  28.
Center the sensor between the pipe flanges and mount it in the measuring path.
A mounting kit consisting of screws/mounting bolts, gaskets, nuts and washers can
be ordered as an optional extra:
• Directly with the device: Order code for "Accessory enclosed", option PE
• Separately as an accessory →  162
1. Position the device or rotate the transmitter housing so that the cable entries do not
point upwards.
2. Following the correct screw tightening torques and mounting instructions →  28,
mount the sensor between the pipe flanges in the measurement path.
Mounting procedure
A0029263
27