Polaris RANGER ETX 2015 Owner's Manual page 210

Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
HOLE
YEAR
2015-18
2016-18
2016–18
5
2015-18
i.e. 2015 RZR 900 uses the holes marked with a
7. In sequence, torque the (8) engine coupler bracket
fasteners to specification.
TORQUE
Rear Engine Coupler Fastener (In Sequence):
In Sequence:55 ft-lb (75 Nm)
8. In a criss-cross pattern, torque the (4) front engine
mount fasteners to specification.
TORQUE
Front Engine Mount Fasteners:
40 ft-lbs (54 Nm)
3.118
VEHICLE DESCRIPTION
RZR 900
RZR 1000
ACE 900
RANGER Diesel
4
9926806 R03 - 2015 - 2016 RANGER ETX / 570 2-SEAT 2015 - 2016 RANGER 570 CREW Service Manual
9. Torque the two front center isolator bolts (Item 4) to
specification.
TORQUE
Isolator Center Bolt:
40 ft-lbs (54 Nm)
10. Remove the lifting straps and overhead or portable
engine hoist and remove the support previously
installed under the transmission case during the
engine removal process.
11. Reposition the head pipe assembly in the chassis
and install new muffler and head pipe seals (Item 5).
Install the (3) head pipe bolts (Item 6) and torque to
specification.
TORQUE
Exhaust Head Pipe Bolts:
18 ft-lbs (25 Nm)
12. Install the (2) springs (Item 7) securing the muffler to
the head pipe.
13. Install the (3) coolant hoses onto the engine.
14. Install the throttle body and air box. Tighten the hose
clamps that secure the throttle body to the intake
duct, intake boot and air box.
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

Table of Contents