Installation Requirements; Packing List; Additional Installation Requirements - Alvarion WBSn-2400 System Manual

Table of Contents

Advertisement

Chapter 2 - Base Station InstallationInstallation Requirements
Chapter 2 - Base Station Installation
2.1

Installation Requirements

2.1.1

Packing List

Check contents of the package:
Base Station:
»
BS Unit
»
Post clamp
»
Two steel bands
»
2 screws, each with attached spring and flat washers
»
Extraction Key
»
Security cable
»
For WBSn-2400-O, WBSn-2450-O, WBSn-2450-OS and WBSn-2450-SO: Three suitable Omni
Antennas
»
For a unit with Omni antennas (WBSn-2400-O, WBSn-2450-O, WBSn-2450-OS and
WBSn-2450-SO: IP68 waterproof sealing tape)
2.1.2

Additional Installation Requirements

The following items are also required to install the BS:
1 Gigabit Ethernet PoE Injector and a power cable (for details on PoE Injectors available from Alvarion
refer to
Data and Power Ethernet cable: Outdoor Category 5e 4-pair shielded data cable, two shielded RJ45
connectors, and tools required for on-site preparation of the cable if required.
NOTE!
The combined length of the outdoor Ethernet cable (from the PoE Injector to the BS) and the Ethernet
cable connecting to the data networking equipment should not exceed 100 meters.
Grounding cable (10 AWG or thicker) with an M6 terminal ring for connecting to the BS grounding
terminal and an appropriate termination for connecting to protective grounding.
For pole installation: 1"-6" diameter pole (or a suitable tower structure) should be available.
For wall installation: Depending on type of surface - 4 suitable screws or 4 sets of suitable screws and
anchors.
Portable PC and a straight Ethernet cable (for configuration purposes).
Ethernet cable for connecting to the data networking equipment.
WBSn-2400 and WBSn-2450 System Manual
"Power over Ethernet Injectors (optional)" on page

Installation Requirements

6).
8

Advertisement

Table of Contents
loading

Table of Contents