Table of Contents

Advertisement

Chapter 2 - Base Station InstallationVerification
Chapter 2 - Base Station Installation

Verification

2.13

Verification

Disconnect the PC from the IN port of the PoE Injector and connect the IN port to the networking
equipment (that should be configured to provide connectivity from the control center to the base
station). The ability to properly manage the unit from the control center must be verified before leaving
the site.
WBSn-2400 and WBSn-2450 System Manual
19

Advertisement

Table of Contents
loading

Table of Contents