horiba TW-150 Instruction Manual page 38

Water distribution monitor
Table of Contents

Advertisement

3 OPERATION
5. Turn ON the power.
Wait a while until the screen turns displays the MEASUREMENT screen.
"WARM UP!" is displayed until the temperature of the turbidity/color cell becomes stable
(approximately 20 minutes).
6. Adjust the clock.
Reference
"5.7 Clock Adjustment" (page 94)
7. Change the settings as needed.
Reference
"5 FUNCTION" (page 75)
8. Calibrate the values.
Note
When starting the device or after replacing a sensor, operate the device for at least two hours using
sample water until the sensor becomes stable, then perform calibration.
Reference
"4 CALIBRATION" (page 17)
When the start-up procedure is complete, measurement begins.
12
"WARM UP!" is displayed.

Advertisement

Table of Contents
loading

Related Products for horiba TW-150

Table of Contents