Stopping And Restarting Operation - horiba TW-150 Instruction Manual

Water distribution monitor
Table of Contents

Advertisement

7.2

Stopping and Restarting Operation

Stopping operation
1. Close the stop valve.
2. Start the action for the water discharge operation.
Reference
"5.11 Action" (page 105)
Tip
If water is not discharged properly, run sample water again and repeat the procedure from step .
3. Turn off the power.
4. Open the inner door of the device.
Reference
"2.1 Opening the Inner Door of the Device" (page 7)
Restarting operation
1. Close the inner door of the device.
2. Operation starts.
Reference
"3.1 Starting the Device" (page 11)
Stop valve
must be closed.
7 MAINTENANCE
137

Advertisement

Table of Contents
loading

Table of Contents