5 Installation Procedure
Route the option wiring as specified by these procedures.
1.
Connect the communication cables to the option modular connector CN1 as
shown in
A - Pull back the shielding and lightly
twist the end with your fingers to
keep the ends from fraying.
B - About 5.5 mm (when not using
terminal extensions)
C - Blade thickness of 0.4 mm or less
D - Blade width of 2.5 mm or less
2.
Make sure that you correctly connect the wires and that you did not accidentally
pinch wire insulation in the option modular connector CN1.
Trim any frayed wires.
3.
Connect the communication cables to the option modular connector CN1 as
shown in
After the option modular connector CN1 is fully attached to the option, tighten the
screws on the left and right sides of the option modular connector CN1.
Tighten the screws to a correct tightening torque:
• 0.22 N∙m to 0.25 N∙m (1.95 lbf∙in to 2.21 lbf∙in)
32
Figure
5.17.
Figure 5.17 Connect Cable Wiring
Figure
5.18.
E - Option modular connector CN1
F - CC-Link comm cable (do not
soldered ends)
G - Loosen the screws and insert the
cable into the opening on the
terminal block
YASKAWA TOEP C730600 83A CC-Link Installation Manual