YASKAWA CC-Link SI-C3 Installation Manual page 18

Ac drive option
Hide thumbs Also See for CC-Link SI-C3:
Table of Contents

Advertisement

5 Installation Procedure
A - Insertion point for CN5 connector
B - Option
C - Drive front cover
D - Keypad
E - LED label
F - Drive terminal cover
G - Removable tabs for wire routing
Install the Option
Use this procedure to install the option.
DANGER
energized drive. Before servicing, disconnect all power to the equipment and wait for the time specified on
the warning label at a minimum. The internal capacitor stays charged after the drive is de-energized. The
charge indicator LED extinguishes when the DC bus voltage decreases below 50 Vdc. When all indicators
are OFF, measure for dangerous voltages to make sure that the drive is safe. If you do work on the drive
when it is energized, it will cause serious injury or death from electrical shock.
1.
Remove the keypad (B), front cover (A), and terminal cover (C).
Shut off power to the drive and wait for the time specified on the drive warning
label at a minimum. Make sure that the charge indicator LED is unlit, then remove
the keypad and front cover. Refer to the drive manuals for more information.
18
Figure 5.1 Drive Components with Option
Electrical Shock Hazard. Do not examine, connect, or disconnect wiring on an
H - Included screws
I -
Ground wire
J -
Option modular connector CN1
K - Drive grounding terminal (FE)
L - Connector CN5-A
M - Connector CN5-B (Not available
for communication option
installation.)
N - Connector CN5-C (Not available
for communication option
installation.)
YASKAWA TOEP C730600 83A CC-Link Installation Manual

Advertisement

Table of Contents
loading

Table of Contents