This dry vacuum pump is delivered after it is strictly inspected and packed. When the user receives the
package, open it and confirm the following points.
* Check if its components parts are all included.
* Check if the pump specifications comply with those of your orders.
* Check if any damage has not occurred during transportation.
If any fault is found, please inform one of our offices listed in the back at once.
* Regarding pump accessories, check them according to the packing list separately dispatched.
<Storage of the Pump>
* In case the pump is not installed immediately after it is received, store it in a clean environment in the
following conditions:
Temperature
Humidity
* Don't pile packed pumps and don't lay each pump on its side in any case
Don't pile packed pumps and don't lay each pump on its side in any case, otherwise the
damage may be caused to the pumps.
PM10U

2. PRODUCT CONFIRMATION

5 to 40 deg. C
80 % or less (Condensation must not exist)
CONFIRMATION