EBARA EV-A Series Instruction Manual page 22

Dry vacuum pump
Table of Contents

Advertisement

P.22
*Please fix and level the pump on the base (Fig.4.1,Fig.4.2)
If the pump attaches caster and adjuster because of different fixing method, please contact our office.
6-φ11 Hole for fixing pump
M10 Bolts for adjusting level
*The pump is a heavy material (Approx.54kg).
To facilitate the maintenance work, install
the pump on the floor.
*When moving pump on the uneven
place, please put the pump on
the carriage.
*After installation of the pump, please
remove eyebolts.
*Please keep the removed eyebolts.
PM10U
4 positions
30
Fig.4.1 Fixing Position of the pump
Outlet NW25
Inlet NW40
96
280
38 30
Bolt & nut for fixing
( Please
( Please prepare size M10×16 or
prepare
size
Liner
for
adjusting
(Please prepare
required
Fig.4.2 How to Fix the pump
51
Bolt for level adjusting
Pump base
Adjusting
level.
Surface of the base
should be flat and level.
Or attached firm frame.
EBARA
CORPORATION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ev-a06Ev-a06-1Ev-a06-2Ev-a06-3

Table of Contents