Daikin VRV III Manual page 444

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

ED34-862
Installation
Unit Installation
Installing optional accessories before installing the unit is easier. See the installation manuals included with
the optional accessories.
As for the parts to be used for installation work, be sure to use the provided accessories and specified parts
designated by our company.
1. Temporarily install the unit.
Mount the hanger brackets to suspension bolts. Secure the hanger brackets on the top and the bottom with nuts
<1>~<3> (M10, field supplied) and washers (M10, accessory 9)).
2. Adjust the height of the unit with the nut <2>.
(Refer to Fig. 4)
3. Make sure the unit is level.
Use a level or a vinyl tube filled with water to make sure that the unit is level and that the tilt (downward slope) to
the drain socket and air inlet side is within 1°.
(Refer to Fig. 5)
4. Tighten both upper and lower nuts <1>, <3>.
(Refer to Fig. 4)
5. Insulate the four hanger brackets with the sealing pad. (accessory 5) Insulate
the hanger brackets so that the surface and edges of the hanger brackets
cannot be seen. (Refer to Fig. 6)
CAUTION
Setting the unit at an angle opposite to the drain socket or air inlet side might cause leaks.
FXMQ-MF
Nut <1>
(Field supplied)
Washer
(Accessory 9))
Hanger bracket
(attached with main body)
Main body
Nut <2>
(Field supplied)
Nut <3>
(Field supplied)
Fig. 4
Level
Vinyl tube
Hanger bracket
setting bolt
1˚ or less
Air inlet side
Air inlet side
Fig. 5
Drain socket
1˚ or less
Drain
socket
Drain
socket
Sealing pad 5)
: http://splitoff.ru/tehn-doc.html
Installation
13
Slit of
sealing
pad
Hanger
bracket
Fig. 6
439

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents