No. 3 system: When including BS unit
Power supply
single phase
50Hz 220-240V
or
single phase
60Hz 220V
L N
L
N
Indoor unit A
[ PRECAUTIONS ]
1. If no earth leakage breaker is required, install a breaker or
load switch with a fuse for the wiring. If an earth leakage
breaker is required, make sure that the earth leakage
breaker is designed to protect the air conditioner from
ground faults, overloads, and short-circuiting.
2. The remote controller wiring (P1 and P2) and transmission
wiring (F1 and F2) have no polarity.
10-3 CONTROL BY 2 REMOTE CONTROLLERS (Con-
trolling 1 indoor unit by 2 remote controllers)
• Set one of the remote controllers to main and the other to sub
in the case of remote control with two remote controllers.
Switching Main/Sub
(1) Insert a
screwdriver into the clearance between the
grooves of the lower casing and the upper casing to remove
the upper casing. (2 grooves) (The remote controller PCB is
attached to the upper casing.)
Insert the screwdriver here and gently work
off the upper part of remote controller.
12
280
Outdoor unit
BS unit
IN/D
OUT/D
OUT/D
IN/D
F
F
F
F
F
F
F
F
1
2
1
2
1
2
1
2
F
P
P
F
T T
1
2
1
2
1
2
P
P
1
2
Remote controller
(option)
Upper part of
remote controller
Lower part of
remote controller
(2) Set the main/sub switch on one of the remote controller
PCBs to sub. (Keep the switch of the other remote controller
PCB set to main.)
S
S
(Factory setting)
M
Only one remote
S
controller needs to be
M
changed if factory
settings have
remained untouched.
10-4 COMPUTERISED CONTROL (FORCED OFF
AND ON/OFF OPERATION)
(1) Wire specifications and how to perform wiring
• Connect the input from outside to terminals T1 and T2 of
the terminal block for remote controller.
F2
T1
FORCED
OFF
Wire specification
Sheathed vinyl cord or cable (2 wire)
Gauge
0.75 - 1.25 mm
Length
Max. 100 m
Contact that can ensure the minimum appli-
External terminal
cable load of 15 V DC, 10 mA.
(2) Actuation
• The following table explains FORCED OFF and ON/OFF
OPERATIONS in response to Input A.
FORCED OFF
Input "ON" stops operation (impossible by
remote controllers.)
Input OFF enables control by remote con-
troller.
(3) How to select FORCED OFF and ON/OFF OPERATION
• Turn the power on and then use the remote controller to
select operation.
10-5 CENTRALIZED CONTROL
• For centralized control, it is necessary to designate the group
No. For details, refer to the manual of each optional control-
lers for centralized control.
11. FIELD SETTING
NOTE
• Before the test operation of the outdoor unit as explained in
12. TEST OPERATION, be sure to make the following field
settings as explained in 11. FIELD SETTING.
Make sure the control box lids are closed on the indoor and
outdoor units.
Field setting must be made from the remote controller in
accordance with the installation condition.
• Setting can be made by changing the "MODE NO.", "FIRST
CODE NO.", and "SECOND CODE NO.".
: http://splitoff.ru/tehn-doc.html
ED34-862
Remote controller
PC board
T2
Input A
2
ON/OFF OPERATION
Input OFF → ON turns
ON unit.
Input ON → OFF turns
OFF unit.
English
3PN06583-7L
FXMQ-P

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents