Daikin VRV III Manual page 37

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

Features
Easy installation and service maintenance
Downsized
Model name
VAM150GJVE
VAM250GJVE
VAM350GJVE
VAM500GJVE
VAM650GJVE
VAM800GJVE
VAM1000GJVE
VAM1500GJVE
VAM2000GJVE
Parallel air flow system (Daikin)
This system prevents misconnection and simplifies the
installation work
SA
RA
Service Maintenance
Vertical installation is available.
The unit must be installed with the side of RA, SA down.
It is necessary to make a trap.
Because the trap of wiring can protect against ingress of water.
Upside-down installation is available.
It allows the common use of the inspection hole and reduces the space and installation work.
For 2 units closely installed, only one inspection hole of 450 × 450 mm will do for maintenance or replacement of the
heat exchanger element, etc.
Long life filter is equipped.
Maintenance cover
32
Height (mm)
278
278
306
306
338
387
387
785
785
EA
OA
(HC0234)
EA
OA
Maintenance cover
Control box
RA
SA
Control box
Inspection hole
Cross air flow system
SA
RA
Wiring
Trap
Water falls down.
Celling hock
: http://splitoff.ru/tehn-doc.html
ED34-862
EA
OA
(HC0235)
Maintenance cover
In the case of upside-down
installation, take a turn 180˚
the celling hocks.
General Information

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents