Daikin VRV III Manual page 107

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

Accessories
3) After mounting the duct flange 1 to the opening using the mounting screws 2 (M4×12, 4 pieces),
stick the duct flange insulator 3 . Figure 3
4) Before mounting the decoration panel, remove the insulator, and stick the sealing pad retainer 5 to
the indoor unit drain pan. Figure 4
Duct Connection
1) Connect the duct to the outside of the duct flange. Figure 5
2) After the connection, wrap the connection area with tape (field supplied) to prevent an air leak.
Precautions
Perform insulation for all ducts.
Do not perform duct manipulations
shown to the right.
102
Duct flange 1
Mounting screws 2
(M4×12, 4 pieces)
Duct flange insulator 3
Insulator
<<Duct: Nominal diameter φ100>>
Wrap with tape to prevent an air leak.
Duct flange 1
Indoor unit main body
a) Extreme bending
Sealing pad retainer 5
Figure 5
Tape
φ100 duct (field supplied)
b) Multiple bending
: http://splitoff.ru/tehn-doc.html
ED34-862
Figure 3
Figure 4
Be careful not to
block the air outlet.
c) Reduction of connecting
duct diameter
J : 2P137676B
FXFQ-P

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents