Installation
CAUTION
Electrical wiring work should be done by a certified electrician.
If someone who does not have the proper qualifications performs the work, perform the following after the test run is complete.
Remove the control box lid and change the emergency switch above the PC board assembly of the indoor unit from
"NORM." to "EMERG.". Connect the single-phase power supply (1, 3) and ground wire to the inter-unit wiring (50Hz
220-240V) terminal block and confirm drain operation.Be sure to change the switch before turning on the power.
(Refer to Fig. 32)
CAUTION
Clamp solidly to clamp C to tension is not added to the wiring connections.
Be aware that the fan will turn during the operation.
After confirming drainage, turn off the power and be sure to change the emergency switch back to "NORM.".
400
Inter-unit wiring terminal block
Indoor PC
board
Emergency switch
assembly
• Checking the drain
Single phase power supply
1 2 3
NORM. EMERG.
• After the checking
NORM. EMERG.
Fig. 32
Tab
Clamp C
Clamp C
Inter-unit
wiring
terminal
block