Daikin VRV III Manual page 121

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

Accessories
Precautions
This product can be mounted to a ceiling mounted cassette-type air conditioner <round flow>.
According to the table to the right, check the model name of the indoor unit, then mount the product.
At the time of mounting, also refer to the installation manual for the indoor unit main body and to the
one for the decoration panel.
For the duct (field supplied) to be connected, those specified in the table to the right are recommended.
Parts content
Check the following parts.
Name
Branch duct chamber
Mounting screw Installation manual Sealing material Tape for fixing the sealing material
Shape/
Number
M4×16
Number
80
1
10
of pieces
160
Name
Main body insulator
1
2
Shape/
Number
Number
80
1
1
of pieces
160
Preparation Before Installation
• With this branch duct chamber, the blow directions shown in the
figure to the right can be selected.
Select the blow direction that is most appropriate for the room
shape and installation position. (Blow directions other than those
in the figure to the right cannot be selected.)
• From the external static pressure/air volume characteristics (refer
to the technical guide), select the duct length and air outlet.
Precautions
• Be sure to securely block the air outlet of the indoor unit main
body to which the branch duct chamber is mounted. If the
blocking is incomplete, water spraying or condensation may
occur. Do not block the corner sections.
(Refer to
Mounting of Sealing Material to Indoor Unit
• When mounting the branch duct chamber, be sure to perform field
setting of the indoor unit main body.
(Refer to
.)
Field Setting
Mounting of Branch Duct Chamber
When an installation is performed after mounting the branch duct chamber to the indoor unit main body
(at new installation), do not apply force to the branch duct chamber. (Deformation may occur.)
(1) Select the position where the branch duct chamber is mounted.
(2) Mount the branch duct chamber to the indoor unit according to the following procedure. ( Figure 2 is an
example of the face 1 side.)
1) Along the slit, cut the side plate of the indoor unit to which the branch duct chamber is mounted. Then,
cut the internal insulator along the groove.
(Use nippers, etc., to cut the slit section, and cutter, etc., to cut the groove section.) Figure 2
For the port opening operation, do not use a tool that produces chips, such as a saw. The drain system may become clogged, and a water
leak may occur.
2) Use the sealant for sticking so that the gaps between the side plate and internal insulator are filled around the full circumference. Figure 3
• First, stick the main body's opening sealant 4 to left and right of the opening, and the main body's opening sealant 5A ( 5B ) to the upper and lower sides of
the opening.
At this time, fold the main body opening sealant towards the inside so that the gap between the side plate and internal insulator is no longer visible.
Main body opening sealant
5A ( 5B )
(Top plate side)
Main body opening sealant 4
(
)
Stick without leaving
any gap against the main
body's opening sealant
5A ( 5B ).
116
1
2
2
Main body opening sealant
3
4
5A
5B
(Small)
(Large)
2
——
2
2
1
1
With this branch duct, an independent 4-way and simultaneous 2-branch drawing are also possible.
1-way branching, main body 3-direction blow
Closed
Branch
1-way branching, main body 2-direction blow
.)
2-way branching, main body 2-direction blow
Main body opening sealant 4
(
)
Stick without leaving
any gap against the main
body's opening sealant
5A ( 5B ).
Main body opening sealant 5A
Figure 3
Combination table
Model name
Installable indoor unit model name
SkyAir
FCQ(N)71KVEA
KDJP55H80
VRV
FXFQ25~80PVE
SkyAir
FCQ(N)100·125·140KVEA
KDJP55H160
VRV
FXFQ100 · 125PVE
Recommended duct
Branch duct chamber
Connecting duct kit name
K-FDK151B (1 m) or K-FDK152B (2 m) (Flexible duct: Nominal diameter of φ 150)
KDJP55H80
K-FDK201B (1 m) or K-FDK202B (2 m) (Flexible duct: Nominal diameter of φ 200)
KDJP55H160
Branch
Closed
Drain side
Piping side
Closed
Closed
Branching to
either side
Another branch duct chamber set is necessary.
Closed
Closed
Branch
Face 3
Face 4
Figure 1
Face 1
Face 4
Indoor unit main body
Internal
Side plate
insulator
Main body opening sealant 5A ( 5B )
Internal
insulator
Stick so that the gap between
the side plate and internal
insulator are filled around the
full circumference.
Sectional View
: http://splitoff.ru/tehn-doc.html
ED34-862
Closed
Branch
Closed
Branch
Closed
Branching to
Closed
either side
Closed
Closed
Branch
Face 2
Face 3
Face 2
Internal insulator
Side plate
Face 1
Figure 2
Side plate slit (Internal insulator groove)
Opening
JC : 1P137894D
FXFQ-P

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents