Daikin VRV III Manual page 402

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

ED34-862
Bolt Pitch
1. FOR 4-WAY AIR DISCHARGE
1. Relation of holes for indoor unit, suspension bolt
position, piping and wiring. (Refer to Fig. 2)
(Illustrations seen from ceiling)
∗ Dimensions in ( ) for 100 and 125 models
∗∗∗ Suspension bolt pitch
2. Make holes for suspension bolts, refrigerant and
drain piping, and wiring. (Refer to Fig. 3)
• Refer to the paper patten for the locations.
• Select the location for each of holes and open the
holes in the ceiling.
False ceiling
Suspension bolt
NOTE
All the above parts are field supplied.
2. FOR 2-WAY OR 3-WAY AIR DISCHARGE
2-way and 3-way air discharge must be set from the remote controller. For details, see FIELD
SETTING.
1. Relation of holes for indoor unit, suspension bolt
position, piping and wiring. (Refer to Fig. 8)
NOTE
Illustrations seen from ceiling
∗ Dimension in ( ) for 100 and 125 models
∗∗∗Suspension bolt pitch
2. Make holes for suspension bolts, refrigerant
and drain piping, and wiring. (Refer to Fig. 9)
• Refer to paper pattern for the locations.
• Select the location for each of holes and open
the holes in the ceiling.
False ceiling
Suspension bolt
Fig. 9
FXUQ-MA
Ceiling slab
Anchor
Long nut or turnbuckle
Fig. 3
Ceiling slab
Anchor
Long nut or turnbuckle
B
Upward running drain
163
Drain hose connection (VP20)
895
790 ∗∗∗
C
B
A
Rightward running drain
117
piping shown above
Liquid piping
Gas piping
Drain hose
connection (VP20)
Fig. 8
: http://splitoff.ru/tehn-doc.html
Installation
895
790∗∗∗
C
D
A
piping shown above
Liquid piping
Gas piping
Fig. 2
D
397
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents