Daikin VRV III Manual page 197

Hide thumbs Also See for VRV III:
Table of Contents

Advertisement

Installation
1. Remove the control box lid. Connect the remote controller
and power supply (single-phase, 50 Hz 220-240 V or sin-
gle-phase, 60Hz 220V) respectively to the terminal block
and securely connect the earth also (as shown in the figure
below).
CAUTION
Securely clamp the cables with the clamps (9)(10) offered
as accessories as shown in Fig. 17 so that tension will not
be applied on the cable connection areas.
2. Confirm that the control box lid is closed before turning on
the power.
3. Remove the inspection lid.
4. Gradually pour approximately 1L of water from the inspec-
tion window into the drain pan to check drainage.
CAUTION
Be sure to prevent an external force from being exerted on
the float switch.
(This may cause breakage.)
5. Attach the inspection lid.
6. Perform the following operation using the remote controller,
and check drainage.
• Select the inspection/test operation button "
the remote controller. The unit will engage the test oper-
ation. Press the operation selector button "
select FAN OPERATION "
• Press the ON/OFF button "
drain pump will operate.)
CAUTION
The fan will turn also at the same time. Take due care.
Do not touch the drain pump to prevent electric shock.
Drain outlet
Refrigerant pipes
Service drain hole
(with rubber cap)
P1
P2
F1
F2
T1
T2
REMOTE
TRANSMISSION
FORCED
CNTRL
WIRING
OFF
Remote controller
terminal connection
method
7. Make sure to use the remote controller in finishing the oper-
ation.
In case of PBVET, NBVET type (without drain pump)
CAUTION
• The connection opening on the drain piping may vary
depending on the model, so check the model name and use
the right method for that model.
• Make sure all water is out before making the duct connection.
8
192
" using
TEST
", and
".
". (The indoor fan and
Inspection window
Portable pump
Inspection lid
Bucket
L
N
Indoor PCboard
L
N
(ASSY)
Power supply:
Single phase,
50 Hz, 220 V~
P1
P2
F1
F2
T1
T2
REMOTE
TRANSMISSION
FORCED
240V
CNTRL
WIRING
OFF
L
N
Single phase,
60Hz, 220 V
Power terminal
connection
method
Terminal block
Terminal block
(1) Install the drain piping.
Refrigerant pipes
Connect the drain pipe after removing the rubber cap and
insulation tubing attached to the connection hole.
• Make sure the drain works properly.
• The diameter of the drain piping should be greater than or
equal to the diameter of the connecting pipe (vinyl tube; pipe
size: 20 mm; outer dimension: 26 mm).
(not including the riser)
• Keep the drain piping short and sloping downwards at a gra-
dient of at least 1/100 to prevent air pockets from forming.
(Refer to Fig. 14)
Central drain piping
Fig. 14
(with a slope of at least 1/100)
CAUTION
Water accumulating in the drain piping can cause the
drain to clog.
• To keep the drain piping from sagging, space hanging
bracket every 1 to 1.5 m.
• Use the drain hose (2) and the metal clamp (1). Insert the
drain hose (2) fully into the drain socket and firmly tighten the
metal clamp (1) with the upper part of the tape on the hose
end. Tighten the metal clamp (1) until the screw head is less
than 4 mm from the hose. (Refer to Fig. 15, 16)
• The two areas below should be insulated because conden-
sation may form there causing water to leak.
• Drain piping passing indoors
• Drain socket
Referring the figure below, insulate the metal clamp (1) and
drain hose (2) using the included large sealing pad (5).
(Refer to Fig. 16)
Metal clamp (1)
(accessory)
Tape
Drain hose (2)
(accessory)
Fig. 15
: http://splitoff.ru/tehn-doc.html
ED34-862
Drain socket
Large sealing
pad (5)
(accessory)
Metal clamp (1)
(accessory)
4mm
Fig. 16
English
3PN09042-1A
FXDQ-PB / FXDQ-NB

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents