Installing The Outer Rails On The Equipment Rack - Allied Telesis x950-52XTQm Installation Manual

Standalone switches, advanced layer 3+ alliedware plus
Table of Contents

Advertisement

Chapter 8: Installing the Switch in the RKMT-SL01 Sliding Rack

Installing the Outer Rails on the Equipment Rack

146
To install the outer rails to the equipment rack, perform the following
procedure.
1. Locate the FRONT and REAR labels on the sides of the rails. You
have to install the rails with the FRONT labels at the front of the
equipment rack and the REAR Labels at the back. Refer to Figure 86.
Figure 86. FRONT and REAR Labels on the Outer Rails
2. Attach the outer rails to the equipment rack using the supplied screws.
Use four screws per rail. Refer to Figure 87 on page 147. Installing the
switch can be easier if you leave the screws slightly loosened now and
fully tightened them after the switch is installed.
Warning
Built-in stoppers prevent the outer rails from extending beyond their
maximum length of 960 mm (37.8 in). Do not force the rails beyond
the maximum length. Otherwise, the brackets will be weakened, and
the switch may fall from the rack and be damaged.
Warning
Verify that the front and rear of both outer rails are attached at the
same distance from the floor, otherwise the switch may fall from the
rack.
E66
3. Go to "Installing the Extension Brackets on the Inner Rails" on
page 148.
E65

Advertisement

Table of Contents
loading

Table of Contents