Support Surface And Fastening - Ingeteam Ingecon Sun 250 TL Installation Manual

Table of Contents

Advertisement

Ingeteam Energy, S.A.
CAUTION
Facilitate the flow of air entering through the front ventilation grids, and the exhaust air through the
top grids.

2.1.8. Support surface and fastening

Due to the Ingecon
Sun Power Max unit's heavy weight, the ground on which it rests should be firm and completely
®
level.
Access to the AC feed varies depending on whether the model is NAC or not. In NAC models, each feed is made from
the base of each of the modules. In all other models, however, all the modules are powered through the base of the
AC module, which is the one on the right.
If the unit sits on a lower void for cabling, the base should rest on firm ground as much as possible without causing
mechanical stresses to the structure. Below you will see minimum supports for each unit (in millimetres).
Ingecon
Sun 250 TL, 315HE TL, 365HE TL, 400HE TL and 420HE TL
®
16
Installation manual
AAV2000IKI01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents