Ingeteam Ingecon Sun 250 TL Installation Manual page 4

Table of Contents

Advertisement

Ingeteam Energy, S.A.
CAUTION
Compliance with the safety instructions set out in this manual or in the suggested legislation does
not imply exemption from other specific standards for the installation, place, country or other cir-
cumstances that affect the inverter.
CAUTION
Carry out all control and handling without voltage.
As a minimum security measure in this operation, the so-called five golden rules should always be
followed:
1. Disconnect
2. Prevent any possible resupply
3. Check there is no voltage
4. Ground and short circuit the equipment
5. Protect from live elements, if any, and put up safety signs around the work zone.
Until these five steps are completed, the work area cannot be considered voltage-free and any work
performed will be considered to be work on live equipment.
CAUTION
Following is a list of the basic obligatory safety standards for each country:
RD 614/2001 in Spain.
CEI 11-27 in Italy.
DIN VDE 0105-100 and DIN VDE 1000-10 in Germany.
UTE C15-400 in France
CAUTION
Category III - 1000-Volt measuring instruments must be used for checking for the absence of
voltage.
Ingeteam Energy, S.A. is not liable for any damages caused by improper use of their equipment.
iv
Installation manual
AAV2000IKI01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents