Ingeteam Ingecon Sun 250 TL Installation Manual page 75

Table of Contents

Advertisement

Installation manual
If there is no continuity, you can narrow down the exact spot where the problem is by checking between X7.1 Q2,
between Q2 and Q4, between Q4 and Q and between Q5 and J19.6.
To locate the position of the terminals within the intake board, see explanatory drawing titled "Intake
board" on page 72.
The following figure details the location of the various terminals which need to be checked. As it indicates, the first
block has four terminals and the following modules have three.
AAV2000IKI01
Ingeteam Energy, S.A.
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents