Ingeteam Ingecon Sun 250 TL Installation Manual page 81

Table of Contents

Advertisement

Installation manual
For supporting the inverter:
Ratchet 13 (M8) for fixing the inverter.
Ratchet 7 (M4) for removing the top cover.
Proceed in the following order:
1.
Disconnect the unit from the power grid and the PV array.
2.
Wait at least 10 minutes for the capacitances to discharge.
3.
Check that there are no voltages inside the unit.
4.
Disconnect optical fibre cable
5.
Unscrew the top cover.
6.
Disconnect the "Power cables" at the bottom of the block.
7.
Disconnect the wires entering the "Terminal strip" from outside the block.
8.
Disconnect communication boards or analogue inputs.
9.
Disconnect the display cable.
10. Unscrew the four anchor points or "fastenings".
11. Remove it.
For reassembly, we will perform the same steps in reverse order and finally will need to set the electronic blocks:
1.
Mount it.
2.
Tighten the fixing screws
3.
Disconnect the display cable
4.
Connect communication boards or analogue inputs.
5.
Connect the wires entering the "Terminal strip" from outside the block.
6.
Connect the "Power cables" at the bottom of the block.
7.
Screw on the top cover.
8.
Connect the optical fibre cable
9.
Connecting the unit to the PV array.
AAV2000IKI01
Electronic block
Ingeteam Energy, S.A.
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents