Ingeteam Ingecon Sun 1Play HF Installation And Usage Manual

Ingeteam Ingecon Sun 1Play HF Installation And Usage Manual

Hide thumbs Also See for Ingecon Sun 1Play HF:
Table of Contents

Advertisement

INGECON SUN 1Play HF
Installation and usage manual

Advertisement

Table of Contents
loading

Summary of Contents for Ingeteam Ingecon Sun 1Play HF

  • Page 1 INGECON SUN 1Play HF Installation and usage manual...
  • Page 2 Ingeteam Power Technology, S.A. - Energy ABF2011IQE01_A 09/2014 Avda. Ciudad de la Innovación, 13 31621 SARRIGUREN (Navarra) - Spain Tel.: +34 948 28 80 00 Fax.: +34 948 28 80 01 e-mail: solar.energy@ingeteam.com Service Call Center: +34 948 698 715...
  • Page 3 Ingeteam INGECON SUN 1Play HF Installation and usage manual ABF2011IQE01_A - Installation and usage manual...
  • Page 4 Ingeteam The copy, distribution or use of this document or of its content requires written authorisation. Any breach thereof will be reported for damages. All rights reserved including those of patent rights or design registration. The conformity of the document content with the hardware described has been checked. However, discrepancies may exist. Liability will not be assumed for total concordance.
  • Page 5: Table Of Contents

    Contents Ingeteam Contents Contents ..............................5 1. About this manual ............................7 1.1. Scope and nomenclature ........................7 1.2. Recipients ............................7 1.3. Symbols ............................7 2. Unit description ............................8 2.1. Overview ............................8 2.2. Optional accessories ........................8 2.3. Electrical safety ..........................8 2.3.1. Overvoltage category (OVC) .......................8 2.4.
  • Page 6 Ingeteam Contents 12. Commissioning ............................31 12.1. Equipment inspection ........................31 12.1.1. Inspection ...........................31 12.1.2. Hermetic sealing of the unit ....................31 12.2. Start-up ............................31 13. Display control .............................32 13.1. Keypad and LEDs ........................32 13.2. Display ............................33 13.3. Menu structure ..........................34 13.4. Daily power graph ........................35 13.5.
  • Page 7: About This Manual

    This document will refer to the various models by both their complete name and their abbreviation. Similarly, it will refer generically to any of the models in the INGECON SUN 1Play HF families with the terms unit or inverter. 1.2. Recipients This document is intended for qualified personnel.
  • Page 8: Unit Description

    The INGECON SUN 1Play HF are single-phase PV inverters with a high frequency transformer, which therefore provide galvanic insulation between the panel and the electricity grid, grounding the PV panel at either positive or negative terminals.
  • Page 9: Protection Rating

    Unit description Ingeteam 2.4. Protection rating These units meet IP65 protection rating against external agents. IP65 means that the unit is fully protected against the ingress of dust and also against water jets from any direction as defined for this level of protection in standard IEC 60529.
  • Page 10: Tables Of Specifications

    Ingeteam Unit description 2.8. Tables of specifications 2.5HF 2.7HF 3.3HF 3.68HF DC input Recommended power range of PV array 2.8 ~ 3.3 kWp 3 ~ 3.6 kWp 3.2 ~ 4 kWp 3.8 ~ 4.3 kWp 3.9 ~ 4.8 kWp Maximum input voltage...
  • Page 11 Unit description Ingeteam 4.6HF 5.5HF DC input Recommended power range of PV array (1) 5.2 ~ 6 kWp 5.7 ~ 6.5 kWp 6 ~ 6.8 kWp 6.3 ~ 7 kWp Maximum input voltage 550 V 550 V 550 V 550 V...
  • Page 12: Description Of Access

    Ingeteam Unit description 2.9. Description of access Connection SD card DC + Grounding fuse reader USB Type B Connection AC Connection DC isolating switch Fans Precut holes for various DC – cables ABF2011IQE01_A - Installation and usage manual...
  • Page 13: Safety

    Safety Ingeteam 3. Safety This section describes the safety warnings and the Personal Protective Equipment used in the unit. 3.1. Safety conditions General warnings The operations described in this manual may be performed only by qualified personnel. The status of qualified personnel referred to in this manual will be, as a minimum, that which meets all the standards, regulations and laws regarding safety applicable to the tasks of installing and operating this unit.
  • Page 14: Personal Protective Equipment (Ppe)

    Ingeteam Safety Ingeteam accepts no liability for any damages caused by improper use of the equipment. Any work carried out on any equipment which implies a modification of the original electrical arrangements must be proposed in advance to Ingeteam. These must be studied and approved by Ingeteam.
  • Page 15: Receipt Of The Unit And Storage

    Failure to follow the instructions provided in this section may lead to damage to the unit. Ingeteam accepts no liability for damage resulting from the failure to follow these instructions. If the unit is not installed immediately after reception, the following points should be taken into account in order to avoid damage: •...
  • Page 16: Equipment Transport

    The unit must be protected, during transport, from mechanical knocks, vibrations, water splashes (rain) and any other product or situation which may damage it or alter its behaviour. Failure to observe these instructions may lead to loss of warranty on the product, for which Ingeteam is not responsible. 5.1. Transport...
  • Page 17: Preparation For Installing The Unit

    Preparation for installing the unit Ingeteam 6. Preparation for installing the unit When deciding the location of the unit and planning your installation, you must follow a set of guidelines based on the specifications of the unit. These guidelines are summarised in this chapter.
  • Page 18: Environmental Conditions

    Ingeteam Preparation for installing the unit • Keep an area of 50 cm at the top and bottom of the unit and 30 cm at the side free of obstacles. Only in this way will the unit’s cooling system operate correctly.
  • Page 19: Cabling Length

    A thermomagnetic circuit breaker and/or fuse must be installed on the connection between the inverter and the electric grid. The following table provides the necessary data for the selection of these devices by the installer. Rated current for the Maximum inverter INGECON SUN 1PlAy HF type B thermomagnetic current circuit breaker 2.5HF 13.5 A...
  • Page 20: Installing The Unit

    Ingeteam Installing the unit 7. Installing the unit Before installing the unit, the packaging must be removed, taking special care not to damage the housing. Check that there is no condensation inside the packaging. If there are signs of condensation, you must not install the unit until you are sure it is completely dry.
  • Page 21 Installing the unit Ingeteam Mark the fixing points for the plates on the wall. Drill holes in the wall with a suitable bit for the screws to be used to secure the plate to the wall later. Fasten the plate using steel wall screws M6x70 mm, with the corresponding washers and plugs.
  • Page 22: Opening The Housing

    Ingeteam Installing the unit Mark the lower anchoring point, remove the unit and drill the hole in the wall. Install the unit again and attach the bottom attachment using steel a wall screw M6x70 mm, with the corresponding washer and plug.
  • Page 23 Installing the unit Ingeteam To access the inside of the unit open the cover of the housing by removing the 4 front screws. ABF2011IQE01_A - Installation and usage manual...
  • Page 24: Connection Of Accessories

    Ingeteam Connection of accessories 8. Connection of accessories This chapter explains the process for wiring the optional accessories to the unit. As standard these units have local communication via USB. In addition there is the option of establishing connections using other technology types: •...
  • Page 25: Wiring Process

    Connection of accessories Ingeteam Once the hole has been opened, insert the packing gland. Secure it to the housing with its nut. 8.3. Wiring process Depending on the type of accessory to install you must use the connector INGECON Connect or those marked as INGECON Comm of the inverter power card.
  • Page 26 Ingeteam Connection of accessories The gauge of the cables used must be between 0.25 and 2.5 mm . This device is connected using a conduit with at least two poles. To insert the cable into the unit, use one of the precut holes. Cut it and fit the corresponding packing gland.
  • Page 27: Connection Of The Ground Connection

    10 minutes until internal capabilities are fully discharged. Ingeteam accepts no liability for any damages caused by incorrect connection. After connecting the ground wiring, do not switch on the power until you have made all other connections and the unit has been closed.
  • Page 28: Ac Connection

    10.1. Safety instructions for the AC connection Consult section “3. Safety” and the following safety instructions before working in the unit. Ingeteam accepts no liability for any damages caused by incorrect connection. Use the Personal Protective Equipment specified in the section “3.2. Personal Protective Equipment (PPE)”.
  • Page 29 Respect the installation of L, N and ground as described in this section for correct operation and for the safety of the installation. If the lines l and N are reversed the inverter will not work. Ingeteam accepts no liability for any consequences of incorrect connection. Insert the connector as shown in the following figure.
  • Page 30: Dc Connection

    11.1. Safety instructions for the DC connection Consult section “3. Safety” and the following safety instructions before working in the unit. Ingeteam accepts no liability for any damages caused by incorrect connection. Use the Personal Protective Equipment specified in the section “3.2. Personal Protective Equipment (PPE)”.
  • Page 31: Commissioning

    Commissioning Ingeteam 12. Commissioning This chapter details the process for the commissioning of the unit. 12.1. Equipment inspection The correct condition of the installation must be checked before start-up. Each installation is different, depending on its characteristics, the country in which it is located or other special conditions which may apply.
  • Page 32: Display Control

    Ingeteam Display control 13. Display control These units incorporate a display + keypad unit for communication with the installer and the user. This interface allows the display of the main internal parameters and the configuration of the entire system during installation.
  • Page 33: Display

    Display control Ingeteam 13.2. Display The main display shows different inverter data: 06/05/2014 06/05/2014 10:17 10:17 Current date, YYYY-MM-DD. Power reduction percentage of and reason for this reduction*. Current time, hh:mm. Voltage and power of the PV array. Both pieces of data are viewed of forming alternately.
  • Page 34: Menu Structure

    Ingeteam Display control 13.3. Menu structure Daily power graph Start screen Energy graph for the last 24 days Main menu Monitoring Pac, Qac, Sac, PhiCos Vac, Iac, Fac Pdc, Vdc, Idc, Riso Total: Energy, Time, Connections Partial: Energy, Time, Connections...
  • Page 35: Daily Power Graph

    Display control Ingeteam 13.4. Daily power graph 06/05/2014 06/05/2014 10:17 10:17 In this screen you can consult the daily power graph. The daily energy values (Ed), from the first connection of the day to the time of the query, the total accumulated energy (Et) and the power (P) are also listed.
  • Page 36: Monitoring

    Ingeteam Display control 13.6.1. Monitoring This menu includes a series of screens which show the main variables being monitored. To move between the different screens use the keys See below for the structure and interpretation of the variables in this menu: Inverter AC power, in watts.
  • Page 37: Advanced Settings

    The settings included within this menu can only be modified by a qualified installer. Ingeteam accepts no liability for incorrect use of the installer password nor the consequences that may arise from incorrect configuration of the unit by the user and/or the installer.
  • Page 38: Firmware Update

    > FW version. The firmware is updated using a SD HC type memory card (not supplied by Ingeteam). There must be a card of this type in FAT32 format. The card must be formatted and must not contain any files.
  • Page 39: Communication Via Usb

    15. Communication via USB These units can communicate locally with a PC via USB using the plant management software INGECON SUN Manager, available on the Ingeteam website (www.ingeteam.com). Consult the INGECON SUN Manager manual for more information. 15.1. Wiring process Remove the cover from the USB Type B connector.
  • Page 40: Shutting Down The Unit

    Ingeteam Shutting down the unit 16. Shutting down the unit This section describes the procedure to shut down the unit. If you wish to work inside the unit, these instructions must be carried out in the order shown here to remove the power.
  • Page 41: Preventive Maintenance

    Ingeteam accepts no liability for any damages caused by improper use of the equipment. Any work carried out on any equipment which implies a modification of the original electrical arrangements must be proposed in advance to Ingeteam.
  • Page 42: Troubleshooting

    Ingeteam Troubleshooting 18. Troubleshooting This section provides a guide for troubleshooting problems that may arise in the installation and operation of the inverter. It also explains how to perform simple operations such as component replacement and unit configuration. Troubleshooting for the inverter must be performed by qualified personnel in compliance with the general safety instructions in this manual.
  • Page 43 Troubleshooting Ingeteam Alarm Description Solution lighting* Orange, Inverter shutdown due to firmware FW update Normal shutdown due to inverter firmware update. constant load Grid consumption power out of the Grid consumption Orange, 1 permitted range This may be due to a low irradiance level. Otherwise, The generated power in the PV check the PV array.
  • Page 44: Waste Handling

    At the end of the unit's life, the waste must be processed by an authorised waste management company. Ingeteam, in accordance with its policy of respect for the environment, will inform the authorised manager, via this Section, of the location of components to be decontaminated.
  • Page 45 Notes...
  • Page 46 Notes...
  • Page 47 Europe America Asia Ingeteam Power Technology, S.A. Ingeteam INC. Ingeteam Shanghai, Co. Ltd. Energy 5201 Great American Parkway, Suite 320 Shanghai Trade Square, 1105 Avda. Ciudad de la Innovación, 13 SANTA CLARA, CA 95054 - USA 188 Si Ping Road 31621 SARRIGUREN (Navarre) - Spain Tel.: +1 (415) 450 1869...
  • Page 48 ABF2011IQE01_A 09/2014 Ingeteam Power Technology, S.A. www.ingeteam.com...

Table of Contents