4-1-2. Tension Regulator Operating Position Adjustment
Precaution
Perform the tension regulator operating position adjustment when the tension
regulator band assembly and/or S reel table assembly are replaced.
Preparations
1. Confirm that the unit is in the unthreading end state.
2. Turn off the power.
3. Remove the front lid and outside panel.
(Refer to section 1-6 in Part 1 of the Maintenance Manual.)
Tools
. Torque screwdriver bit (for M2)
. Torque screwdriver (for 3 kg)
. Parallel pin
. Thickness gauge
Confirmation
1. Mode setting
Turn the worm wheel of the manual eject assem-
bly to put the unit into the threading end state.
(Refer to section 3-1-4.)
n
Do not turn the worm wheel more than required.
This may damage the unit.
DNV-5
DNW-7/90/90WS
J-6325-380-A
J-6325-400-A
3-703-358-08
4-1-2. Tension Regulator Operating Position Adjustment
4-3