3.9-2
Locking the Turret
1.
Ensure that turret is positioned so that turret
transportation lock tube
aligned into one of two turret locking points on
the chassis.
2.
Lift turret lock retaining pin
and rotate 90 degrees. Lower turret lock retaining
pin into locked position.
3.9-3
Lifting
IMPORTANT
Optional lifting points are required.
1.
Place boom in stowed position, centered between
drive wheels. Lock turret using turret transportation
locking pin (refer to
2.
Turn main power disconnect switch to "
position.
2
1
TRANSPORT
TIE-DOWN POINTS
SJ 82T & SJ 86T
(item 2 – Figure
3-14) is
(item 1 – Figure
Section
3.9-2).
2
1
Figure 3-14. Turret Transportation Lock & Locking Points
LIFTING POINTS
C L
X
77in
77in
1.95m
1.95m
X (81/86T) = 20 " (508mm)
Figure 3-15. Lifting Points
3.
Clear platform of all personnel, tools and materials.
When lifting the aerial platform, lifting
devices must be attached to designated
lift points only (refer to
3-14)
Use chains with load capacity sufficient
to withstand aerial platform weight.
Refer to the serial plate of the aerial
platform for specific weight.
4.
Properly adjust rigging to ensure aerial platform
remains level during lifting. See Center of gravity
location
" off
Transport Turret Lock Point
TRANSPORT
TIE-DOWN POINTS
Loading/Unloading
WARNING
Figure
WARNING
(Figure
3-15).
Transport Turret Lock Point
LIFTING POINTS
3-15).
Page 67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86t

Table of Contents