Skyjack SJ82T Operating Manual page 54

Telescopic booms
Hide thumbs Also See for SJ82T:
Table of Contents

Advertisement

Section 3 - Operation
3.5-5 Glazier Tray (If Equipped)
The tray is installed on the front side of the platform.
Figure 3-5. Glazier Tray
1.
Strap - This strap is used to secure panel in place.
2.
Foam Support - This foam support with cover
bumper is used as a cushion to protect the panel.
3.
Glazier Tray - This tray is used to carry the panel.
The combined weight of attachment,
panels, occupants and tools should not
exceed platform rated capacity.
SJ 82T & SJ 86T
NOTE
Component Identification (Optional Equipment/Attachments)
3.5-6 Welder (If Equipped)
The welder is installed on the platform. Refer to
welder's operating manual for proper operation and
maintenance.
1
2
3
1.
Welder - This equipment is plugged into its
dedicated AC outlet on the platform.
2.
Welder AC Outlet - This AC outlet is dedicated
for the welder.
In sub-zero temperatures, the hydraulic oil
should be warmed, prior to operating the
Refer to option's manual and labels
for actual weight. This weight must be
included when determining the total load
on the platform, including personnel and
Only qualified/competent persons should
install, operate, maintain and repair the
Breathing welding fumes and gases can
Figure 3-6. Welder
NOTE
welder.
NOTE
other materials.
WARNING
welder.
CAUTION
be hazardous to your health.
1
2
Page 55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86t

Table of Contents