Skyjack SJ82T Operating Manual page 37

Telescopic booms
Hide thumbs Also See for SJ82T:
Table of Contents

Advertisement

Section 2 - Familiarization
Base Control Console
Test Positive Air Shutoff (If Equipped)
This function test should NOT be
performed while the engine is running.
1. Open engine compartment cover.
2. On the base control console, lift switch
guard and push rocker switch to "on"
position.
3. Push rocker switch to "off" position. LED
light should continuously illuminate. Walk
back to the engine compartment side of the
aerial platform.
Result: The shutoff valve should disengage
after 20 seconds (refer to shutoff valve
diagrams).
4. Close engine compartment cover. Ensure
switch is returned to "off" position and
switch guard is down.
SJ 82T & SJ 86T
It is the responsibility of the operator to read, completely understand and follow all instructions and warnings
Positive Air Shutoff
Switch
CAUTION
contained in this operating manual and on the aerial platform.
Positive Air Shutoff Option
Shutoff Valve
Shutoff Valve
Engaged
Disengaged
Engine Compartment Side
Function Tests
Page 37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86t

Table of Contents