208
PML630 performs load-shedding action in its own area, provided that an adjacent
PML630 has executed the load-shedding action and the actual shed load is less than
required. PML630 receives the load-shedding information from an adjacent PML630
to shed identified loads in its own area.
The load-shedding trigger is extended by an adjacent PML630,
provided that a load-shedding action is initiated in the respective
adjacent PML630 due to fast load-shedding trigger, external trigger
input or load-shedding trigger received from another adjacent
PML630.
See NPMMXU, LSCACLS and PPLSGGIO for details regarding
extended load-shedding action.

Load-shedding blocking

Load-shedding is blocked due to various conditions of power source, bus coupler or
tie circuit breaker.
Load-shedding blocking is calculated as shown in
Table 261:
Conditions for load-shedding blocking calculation
Load-shedding blocking due to power source
Circuit breaker position is in intermediate for
more than set value of circuit breaker
intermediate setting.
Circuit breaker position is invalid.
IED data quality is bad.
Depending on the network circuit breaker configuration as bus
coupler/tie circuit breaker, the load-shedding blocking is calculated
for the network circuit breaker.
Load-shedding is also blocked if the power source for an external connection is not
configured correctly.
If the load-shedding blocking is activated due to the power source, load-shedding is
blocked in the respective subnetwork where the power source is connected.
If the load-shedding blocking is activated due to the network circuit breaker, load-
shedding is blocked in the associated subnetworks of a network circuit breaker.
If two subnetworks are formed due to the open status of the
compensated circuit breaker status of the network circuit breaker and
load-shedding blocking is activated from the respective network
Table
261.
Load-shedding blocking due to bus coupler/tie
circuit breaker
Circuit breaker position is in intermediate for
more than set value of circuit breaker
intermediate setting.
Circuit breaker position is invalid.
IED data quality is bad.
PML630/Compact Load-Shedding Solution
1MRS757256 F
Technical Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pml630

Table of Contents