Operating Guide

4.3.2 Lifting the Line-up Cabinets

After the packaging of the cabinets is removed, a crane or forklift is required to lift them off the wooden pallets and to the installa-
tion location.
1.
To lift the power cell cabinet and control cabinet, use the four holes of angle steels on the top of the cabinet.
The distance (D) between crane hook and cabinet top must be more than 1.5 m (4.92 ft).
Remove the angle steels after the lifting.
D
Illustration 33: Lifting Points of the Power Cell Cabinet
2.
To lift the options cabinet, use the eyebolts at the four corners on the top of the cabinet.
3.
Since the transformer cabinet is heavy, do not lift it from the lifting rings on the top of the cabinet. Instead, use the lifting
rings of the transformer.
The distance (D) between crane hook and cabinet top must be more than 1.5 m (4.92 ft).
Illustration 34: Lifting Points of the Transformer
4.
Lift the cabinet slowly and without jerking. Lower in the same manner to a standstill position.

4.3.3 Using a Forklift

The forklift must be able lift and bear the weight of the cabinet.
40 | Danfoss A/S © 2021.06