Cable Entry And Termination; Power Cable Entry Of Standalone Cabinet - Danfoss VACON 1000 Operating Manual

Hide thumbs Also See for VACON 1000:
Table of Contents

Advertisement

VACON® 1000
Operating Guide
A
Busbars for connecting power cells in series
B
Output neutral point terminal
A
B
C
Illustration 45: Terminals in the Transformer Cabinet
A
Transformer input terminal
B
Transformer output terminal
C
Grounding connection between cabinets
D
Power connection terminal

6.5 Cable Entry and Termination

6.5.1 Power Cable Entry of Standalone Cabinet

Bottom entry and top entry are possible to the input/output cabinet. The cable routing is assembled for bottom entry or top entry
according to customer requirement.
Danfoss A/S © 2021.06
C
Output power terminal
D
Transformer output terminal
D
E
F
G
E
Motor connection terminal
F
Output power terminal
G
System grounding terminal
AQ363633621020en-000201 / 172F3117 | 49
Electrical Installation

Advertisement

Table of Contents
loading

Table of Contents