Inspection and transport
Procedure
1. Move the power cabinet to the installation location:
2. Move the charge post to the installation location:
5.6.2

Tilt the charge post to the vertical position

Preliminary requirements
Procedure
1. Install the swivel eye bolts or bolts
with lifting loops (A).
2. Connect the hoisting equipment (B).
3. Carefully tilt the charge post (C) to the
vertical position.
4. Remove the swivel eye bolts or bolts
with lifting loops (A).
38
Move the cabinet with a forklift truck. Refer to section 5.6.3.
Hoist the cabinet. Refer to section 5.6.4.
Situation
Tilt the charge post to the vertical
position.
Move the charge post with a forklift
truck.
Hoist the charge post.
The charge post is in the
horizontal position.
The charge post is
unpacked. Refer to section
5.4.
Warning:
Risk of pinching or crushing, the charge post is heavy
Make sure that the hoisting equipment can lift the charge post safely.
Obey the safety instructions that apply to the hoisting equipment.
Take into account the dimensions, the mass and the center of gravity
of the charge post. Refer to chapter 12.
Caution:
Do not drop the charge post. There is a risk of damage.
Procedure
Refer to section 5.6.2.
Refer to section 5.6.3.
Refer to section 5.6.4.
Hoisting equipment,
including cables, swivel eye
bolts or bolts with lifting
loops. Refer to section 12.3.
B
A
6AGA000032-0115-EN | 004
C

Advertisement