SMC Networks EX245-FPS1 Operation Manual page 10

Table of Contents

Advertisement

Maintenance
Turn off the power supply, stop the supplied air, exhaust the residual pressure and verify the release of
air before performing maintenance.
There is a risk of unexpected malfunction.
Perform regular maintenance and inspections.
There is a risk of unexpected malfunction.
After maintenance is complete, perform appropriate functional inspections.
Stop operation if the equipment does not function properly.
Otherwise safety is not assured due to an unexpected malfunction or incorrect operation.
Do not use solvents such as benzene, thinner etc. to clean the SI unit and individual modules
They could damage the surface of the body and erase the markings on the body.
Use a soft cloth to remove stains.
For heavy stains, use a cloth soaked with diluted neutral detergent and fully squeezed, then wipe up the stains
again with a dry cloth.
- 9 -
No.EX##-OMY0004

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EX245-FPS1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Ex245-fps2Ex245-fps3Ex245-dx1Ex245-dy1

Table of Contents