Installation Of The Probe Mux Box Voluson Station - GE Voluson i BT06 Service Manual

Table of Contents

Advertisement

GE
D
KTI106052, R
IRECTION
3-5-3-7

Installation of the Probe Mux Box Voluson Station

1.) Fasten the Probe Mux Box with the 4 screws.
2.) Push the probe connector into the probe socket of the Voluson i / Voluson e and lift the system's
locking lever upwards to lock the probe connector.
NOTE:
The docking lever cannot be operated if the Probe Box is connected to the Voluson i / Voluson e.
3-40
10
EVISION
Figure 3-48 Installation Probe Mux Box
Section 3-5 - Connection of Auxiliary Devices
V
i / V
e
OLUSON
OLUSON
S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents