Preliminary Checks - Introduction; Preliminary Checks - Tests On Demand - Siare Falco 202 User Manual

Lung ventilator turbine-driven ventilation
Table of Contents

Advertisement

3.6
Preliminary checks – Introduction
The preliminary checks are divided in 3 phases.
TESTS ON DEMAND
o O 2 Sensor calibration
Ventilator
o Respiratory parameters
o Spirometry
Lung Ventilator alarms

3.6.1 Preliminary checks - TESTS ON DEMAND

Falco 202
WARNING !! Patient injury hazard
All figures and examples featured in this chapter are purely informative
and do not refer to real clinical cases.
WARNING !! Lung ventilator failure risk.
Running or cancelling the preliminary checks might result in a
malfunction during ventilator operation: pay utmost attention.
Always carry out all preliminary checks, unless there is an emergency
situation.
You should carry out the preliminary checks once the emergency
condition stops, and at least once a week.
The lung ventilator must be ready for use in order for you to proceed
with the preliminary checks.
Connect the power supply, the medical gas (O 2 ) and the patient circuit.
Insert and connect the oxygen sensor.
Connect a patient simulator to the patient circuit terminal.
Ventilator ON : STAND-BY operating mode.
To carry out the TESTS ON DEMAND you must know the keyboard
operating mode and the options available in the ventilator MENU (please
see chapter 2).
3-19

Advertisement

Table of Contents
loading

Table of Contents