Oracle Acme Packet 4600 Hardware Installation And Maintenance Manual page 42

Hide thumbs Also See for Acme Packet 4600:
Table of Contents

Advertisement

Unpacking the Acme
Packet 4600
Mounting Hardware
42
To unpack the Acme Packet 4600:
1.
Inspect the external packing materials and note if they are damaged in any way.
2.
Open the exterior box.
3.
Unpack the contents of the Acme Packet 4600 shipment.
4.
Locate the packing list on the outside of the Acme Packet 4600 shipment box.
5.
Confirm that all of the components listed in the packing list are present and in
good condition.
If you discover that any of the parts are missing or were damaged in
shipment, contact customer support.
The hardware used for the Acme Packet 4600 mounting procedures include the
following:
Front mounting flanges (2) for use with mounting slide rails, used to secure the
chassis into the rack 
Figure 4 - 40. Front Mounting Flanges
Slide rail assembly (2), as shipped, with the chassis slide rail inserted into the
equipment rack slide rail.
Figure 4 - 41. Slide Rail Assembly
Acme Packet 4600 Hardware Installation and Maintenance Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Acme Packet 4600 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents